Case Studies

Case study — HVAC Ducting – Central London Commercial Scheme

HVAC Ducting – Central London Commercial Scheme

HVAC Ducting – Central London Commercial Scheme

With ongoing layout revisions, our variation memory tool and resource-linked claims process ensured 87% of changes were approved on first submission – safeguarding cash flow and preventing scope creep.

Client: HVAC Subcontractor
Value: £1.6M (est.)
Time to read: 3 minutes

Project lead(s)

Overview

This page is a template for a full case study. Replace this paragraph with the full project narrative, outcomes, and any images, PDFs or downloadable assets you wish to include.